Current Projects
Search
 

Home
Search for Projects
View Projects
Project Title
by Subject/Focus Area
by Board/Committee
by Major Unit
Provisional Committee Appointments Open for Formal Public Comments
by Last Update
Meeting Information
Conflict of Interest Policy
Committee Appointment Process
FAQ
  Project Information

Project Information

 Printer Friendly Version

Project Title:

Review of Federal Highway Administration Infrastructure R&D
PIN: TRB-SASP-17-04        

Major Unit:

Transportation Research Board

Sub Unit: Studies and Special Programs Division

RSO: Godwin, Stephen

Subject/Focus Area: Transportation and Infrastructure


Project Scope
An ad hoc committee will advise the Federal Highway Administration (FHWA) Infrastructure R&D Program regarding priorities in terms of the technical tools and products that state departments of transportation need to maintain and improve the performance of their pavements, bridges, and other structures.  FHWA's program includes gathering data on long-term infrastructure performance; structural design; material testing, evaluation, specification and mixture design, and optimization for both traditional and innovative materials; performance evaluation and prediction; construction; life-cycle cost analysis; environmental and sustainability aspects and implications; preservation of bridges, tunnels, culverts, geotechnical elements; aerodynamic and hydraulic engineering guidance; design and mitigation for extreme events (e.g., seismic, blast, and scour); advanced materials and structural systems; tools for the assessment and condition monitoring of highway structures; and data-driven performance management and preservation tools.  The FHWA and its contractors are designing tools and predictive models for highway infrastructure owners to use to maintain and improve their assets; the committee’s role will be to comment on such products as appropriate.  The committee will meet annually to interact with FHWA and other stakeholders and issue an annual assessment in the form of a letter report.

 
Project Duration: 60 months    

Provide FEEDBACK on this project.

Contact the Public Access Records Office to make an inquiry, request a list of the public access file materials, or obtain a copy of the materials found in the file.


Committee Membership
Committee Membership

Meetings
 Meeting 1 - 11/29/2017

Reports

Reports having no URL can be seen
at the Public Access Records Office