Current Projects
 
Search
 

Home
Search for Projects
View Projects
Project Title
by Subject/Focus Area
by Board/Committee
by Major Unit
Provisional Committee Appointments Open for Formal Public Comments
by Last Update
Meeting Information
Conflict of Interest Policy
Committee Appointment Process
FAQ
  Project Information

Project Information

 Printer Friendly Version

Project Title:

Improving the Effectiveness and Efficiency of U.S. Air Force Pre-Acquisition Development Planning
PIN: DEPS-AFSB-12-09        

Major Unit:

Division on Engineering and Physical Sciences

Sub Unit: DEPS Air Force Studies Board

RSO: Ford, Carter

Subject/Focus Area: National Security and Defense


Project Scope
At a minimum, the ad hoc committee will address the following 4 questions and make recommendations to the Chief of Staff of the Air Force (CSAF) and Secretary of the Air Force (SECAF) for improvement;

1. How can development planning be improved to help improve near-term acquisition decisions?
2. How can development planning be improved to help concepts not quite ready for acquisition become more mature, perhaps by identifying the need for more engineering analysis, hardware prototyping, etc.?
3. How can development planning be improved to enable the development of corporate strategic plans, such as science and technology investment roadmaps, Major Command capability roadmaps, workforce development plans, etc.?
4. How can development planning can be used to develop and train acquisition personnel?

In addition to specifically addressing and making recommendations to the four questions above, the committee should consider the following:

• Ensuring a development planning process must be strategic, driven by top-down SECAF/CSAF or corporate Air Force strategic plans and objectives
• Ensuring a development plannning process must be cross-domain and must consider joint capabilities.
• The appropriateness of existing development policies and processes in the Air Force and the Department of Defense.
• Results and impact of development planning activities conducted since the Air Force reinvigorated development planning.
• Appropriate case studies of potential development planning exemplars (e.g., Long Range Strike capability, technology, and acquisition planning).
• How development planning activities and processes should or could fit within Air Force capability planning processes, including Air Force Strategic Planning System and Core Function Master Plans.
• The Air Force's organic capacity, in both manpower and expertise, to conduct development planning, in light of future budgetary constraints.
• The proper role of industry (prime contractors, sub-contractors, support contractors, Federally Funded Research and Development Centers) in conducting development planning during the pre-acquisition phase of the acquisition lifecycle.
• Preferred development planning inputs, activities, and outputs, to include the timing of those activities along the integrated defense acquisition, technology, and logistics life cycle.
• Identification of appropriate Air Force organizations responsible for conducting, funding, evaluating, approving, and utilizing the results of development planning activities
• Incorporation of technology and the “ilities” to include: test; sustainment/maintenance; affordability; evironmental safety and occupational health; security; and human systems, considerations into the development planning process.
• Best practices in government or industry, to include the private sector that could be leveraged by the Air Force and Department of Defense development planning
• Results of prototypes/pilots in the Air Force or Department of Defense as a result of the recent Air Force Studies Board report on capability planning and analysis for intelligence, surveillance and reconnaissance and make recommendations to incorporate or change as appropriate.
• Interfaces with other Services and Agencies, and any supported/supporting relationships feeds the overarching corporate Joint processes for requirements and Department of Defense processes acquisition, cost and program evaluation, logistics and materiel readiness, and others as appropriate.

The project is sponsored by the Department of the Air Force.
The approximate start date is November 15, 2013.
A report will be issued at the conclusion of the study.

Note (04-03-2014): The Project Scope has been updated to make the committee’s charge more specific and clear. The updated version is shown above.


 
Project Duration: 12 months    

Provide FEEDBACK on this project.

Contact the Public Access Records Office to make an inquiry, request a list of the public access file materials, or obtain a copy of the materials found in the file.


Committee Membership
Committee Membership

Meetings
 Meeting 1 - 01/27/2014
 Meeting 2 - 01/30/2014
 Meeting 3 - 02/25/2014
 Meeting 4 - 03/27/2014
 Meeting 5 - 04/29/2014
 Meeting 6 - 05/19/2014
 Meeting 7 - 06/17/2014

Reports

Reports having no URL can be seen
at the Public Access Records Office
Development Planning: A Strategic Approach to Future Air Force Capabilities