Meeting Information



Project Title: Space Radiation Effects Testing Infrastructure for the U.S. Space Program

PIN: DEPS-NMMB-15-05         

Major Unit:
Division on Engineering and Physical Sciences

Sub Unit:
Aeronautics & Space Engineering Board DEPS
National Materials and Manufacturing Board DEPS

RSO:
Day, Dwayne

Subject/Focus Area:
Engineering and Technology; Math, Chemistry and Physics; National Security and Defense; Space and Aeronautics


Space Radiation Effects Testing Infrastructure for the U.S. Space Program
May 31, 2017 - June 2, 2017
Arnold and Mabel Beckman Center
100 Academy Dr.
Irvine, California


If you would like to attend the sessions of this meeting that are open
to the public or need more information please contact:


Contact Name: Dwayne Day
Email: dday@nas.edu
Phone: 202-334-3011
Fax:


Agenda:

Committee on Space Radiation Hardened Electronics Testing
Meeting #2: May 31-June2, 2017
Huntington Room
Beckman Center
100 Academy Way, Irvine, CA 92617
UC Irvine Campus, CA
Wednesday, May 31, 2017

OPEN SESSION

7:30 am Room opens (working breakfast available in the dining room)

8:30 am Meeting convenes; opening remarks Study Director/Chairs

9:00 am Radiation Testing of Focal Plane Arrays & Detectors Vincent M. Cowan
Air Force Research Laboratory

10:00 am Los Alamos and Radiation Testing Heather Quinn
LANL
11:00 am Break (15 minutes)

11:15 am Radiation Assurance for Space Applications Sammy Kayali
JPL

12:15 pm Working lunch in the dining room; discussion continues

1:15 pm CubeSats and Radiation Issues Charles Norton
JPL

2:15 pm Chandah and Radiation Testing Helen Reed
Chandah

3:15 pm Break (15 minutes)

3:30 pm Astrobotic on Radiation Testing Jeff Hopkins
Astrobotic

4:30 pm TBD TBD

5:30 pm Final Remarks

5:35 pm Meeting suspends

6:30 pm Working dinner TBD

8:30 pm Meeting adjourns for the day

Thursday, June 1, 2017

OPEN SESSION

7:30 am Room opens (working breakfast available in the dining room)

8:30 am Meeting convenes; opening remarks

9:00 am LBNL’s testing capabilities Larry Phair
M B Johnson
Lawrence Berkeley

10:00 am Lockheed Martin’s Views on Radiation Testing Daniel Clymer
Lockheed Martin

11:00 am Break (15 minutes)

11:15 am TBD TBD

12:15 pm Working lunch in the dining room; discussion continues

NOTE: Committee will probably go into closed session after lunch.

1:15 pm TBD TBD

3:00 pm Break (15 minutes)

3:15 pm Discussion continues

5:00 pm Meeting adjourns for the day

Friday, June 2, 2017

CLOSED SESSION

8:00 am Room opens (breakfast available in the meeting room)

8:55 am Meeting convenes; opening remarks

9:00 am Committee general discussion

9:45 am TBD TBD

10:45 am Break (15 minutes)

11:00 am TBD TBD

12:00 pm Working lunch in the meeting room; discussion continues

1:00 pm Meeting adjourns for the day

Statement of Task

An ad hoc committee will evaluate the current capabilities and future needs in the United States to ensure electronic components planned for future U.S. space programs are able to withstand the radiation stresses they will be subjected to during their intended mission life. In conducting the study and preparing its report, the committee will:
• Assess the existing infrastructure for verifying the ability of existing and emerging microelectronic, optoelectronic, and photonic components to operate properly in the space radiation environment. A full definition of Infrastructure shall include, but not necessarily be limited to the following five bulleted items–

o Facilities and related resources necessary to characterize radiation stress induced failure modes of electronic components;
o Simulation capabilities and related theory and modeling;
o Facilities and related resources available for undertaking those simulations;
o The workforce available to conduct such simulation and characterization; and
o The training and research experience programs in place to prepare a workforce for these activities.

• Characterize the infrastructure that will be needed in FY 18 and beyond (nominally thru 2030 particularly in the case of particle accelerators) to adequately provide the required capabilities for new and emerging electronic technologies, and identify the principal gaps that exist between existing and needed infrastructure.
• Recommend steps needed to establish within the United States an effective infrastructure that eliminates, or reasonably minimizes, any identified gaps.
• Recommend steps required to provide effective stewardship of the necessary radiation test infrastructure for the foreseeable future.


The following information is provided for any members of the general public who may be in attendance:

This meeting is being held to gather information to help the committee conduct its study. This committee will examine the information and material obtained during this, and other public meetings, in an effort to inform its work. Although opinions may be stated and lively discussion may ensue, no conclusions are being drawn at this time and no recommendations will be made. In fact, the committee will deliberate thoroughly before writing its draft report. Moreover, once the draft report is written, it must go through a rigorous review by experts who are anonymous to the committee, and the committee then must respond to this review with appropriate revisions that adequately satisfy the Academy’s Report Review committee and the chair of the NRC before it is considered an NRC report. Therefore, observers who draw conclusions about the committee’s work based on today’s discussions will be doing so prematurely.

Furthermore, individual committee members often engage in discussion and questioning for the specific purpose of probing an issue and sharpening an argument. The comments of any given committee member may not necessarily reflect the position he or she may actually hold on the subject under discussion, to say nothing of that person’s future position as it may evolve in the course of the project. Any inference about an individual’s position regarding findings or recommendations in the final report are therefore also premature.


Last updated: May 21, 2017, 8 AM



Closed Session Summary Posted After the Meeting

The following committee members were present at the closed sessions of the meeting:
Hyland
Lal
Burch
Nielsen
Harris
Turner
Garrett
Katehi
Ladbury
Bement
Mazur

The following topics were discussed in the closed sessions:
Speakers for third meeting. Report draft and writing assignments. Schedule for the study.

The following materials (written documents) were made available to the committee in the closed sessions:
Report draft.

Date of posting of Closed Session Summary: June 2, 2017